1. Home
  2. Projects
  3. Steel Plates Project for Offshore Oil Rig By Rail & Road from Poti (Geo) to Baku(AZ

Steel Plates Project for Offshore Oil Rig By Rail & Road from Poti (Geo) to Baku(AZ

Implementation period: 06.12.2019-06.02.2020
Consignee: Trans Global Projects

Scope:
-By rail transported 359 steel plates, 6 103.438 ton;
-By road transported 105 steel plates, 526.497 ton;
-Unloading from vessel;
-Provision of rail cars-platforms & low-loaders;
-Loading onto the transport equipment;
-Lashing, documentation and etc at loading railway station;
-Provision of rail/road drawing by Tezi Engineers together with Railway department;
-Preparation and fitting of special frames for rail transportation;
-Railway and road expedition both in Georgia and Azerbaijan;
-Road permits and escort for road transportation;
-Preparing of Method Statement.